Text-only version. View the full version of this page · All text pages

ELM-TSQ-43 Recommended

Two-Stage Turn Queue Box

A designated waiting area positioned in the far corner of an intersection, allowing a cyclist making a left turn (or right turn in left-driving contexts) to cross the intersection in two separate straight-through movements rather than merging across vehicle traffic to execute a conventional turn.

Pattern viewer

[Image: Overview illustration of Two-Stage Turn Queue Box]

An overview illustration of Two-Stage Turn Queue Box. Interactive views haven't been built yet.

Related Media

The items below come from outside the Commonway System, external videos, podcasts, and articles related to this page's topic, not part of the guidebook itself.

Aligned

Are Streets Too Complicated Now?

City Beautiful

Asks whether today's proliferation of lines, signals, and lane types on streets is overcomplication or a needed response to modern demands, a question that runs directly through CS's Element-scale catalog and the density-tiered Corridor retrofit paths this video is tagged to.

MED-004
Aligned

Dutch-style intersection design: bike-friendly

BicycleDutch

Shows the protected-intersection design vocabulary, continuous cycle tracks, corner refuge islands, separated signal phasing, that underpins CS's Protected Intersection pattern and the Corridor retrofit paths built around it.

MED-005

Why this pattern exists

A conventional vehicle-style left turn asks a cyclist to merge across one or more lanes of traffic to reach a turn position, a maneuver that becomes increasingly stressful and dangerous as traffic volume, speed, or lane count increases; a two-stage turn queue box removes that merge entirely by breaking the turn into two straight crossings. This pattern exists to document this specific, well-established alternative to the conventional turning movement.1

Key considerations

References

  1. Legal / regulatory MUTCD 11th Edition with Revision 1 (FHWA, December 2025; effective March 5, 2026), Part 9. Formalized as standard, previously FHWA Interim Approval IA-20.