No illustration of Bridge replacement cross-section has been made yet. Interactive views are planned for every pattern and Retrofit Strategy.

#Overview

Major work on a bridge comes years or decades apart, and a bridge outlasts the typical stretch of road.1 Whatever cross-section goes back on the deck is the one the crossing keeps for a generation. Of the 624,193 bridges in the National Bridge Inventory in 2025, 41,685 (6.7 percent) were rated in poor condition.2 Each of them is a coming chance to get the cross-section right.

#Where this leads: Target patterns

#Applicability and thresholds

Any bridge due for a new deck, rehabilitation or replacement where people may walk or bike at either end. Federal law sets the floor: when a federally funded project replaces or rehabilitates a bridge deck on a highway where people may walk or bike at each end, the bridge must be rebuilt to accommodate them safely if that can be done at reasonable cost.3 On width, AASHTO recommends that a new bridge on an urban collector or arterial be at least as wide, curb to curb, as the approach street, and FHWA notes that sidewalk continuity over the bridge is important.4 Plan for the network the approaches will have, not only the one they have today.1

#Evidence and effectiveness

When Portland rehabilitated the Hawthorne Bridge in 1999, it widened the multi-use path from 6 to 10 ft. About 3,150 people biked across each day in 1999; by 2016 it was about 8,000, and the biggest rise in walking and biking on the bridge followed that project. In Ithaca, the Thurston Avenue Bridge was widened by 12 ft to carry 10 ft sidewalks and 5 ft bike lanes. In Minneapolis, the Franklin Avenue Bridge rehabilitation adds a 14 ft separated multi-use path and extends the bridge's life by 50 to 75 years.1 Building the facility during bridge work almost always costs less than adding it later or building a separate walk and bike bridge.1

#Getting it built

Permanent by nature: the cross-section is set in the structural design. The walking and biking space has to be in the project from the start; left until final design or construction, the options narrow.1 Where the deck is wider than today's traffic needs, the extra width can open as paint and posts and be made permanent later, as with Bridge deck reallocation (RFT-CDR-12). See Construction Methodology & The Build Spectrum.

#Who can move this

The bridge owner, often a state DOT, county or authority rather than the city, and the federal funding behind the project, which brings the 217(e) requirement with it.3 The project's alternatives analysis and public meetings are where walking and biking space gets added or lost.1 See Jurisdiction Variants and Funding & Financing Mechanisms.

#References

  1. Precedent-based Cohn, J. and Sperling, E. (Fehr & Peers), Improving Pedestrian and Bicycle Connectivity During Rehabilitation of Existing Bridges, Pedestrian and Bicycle Information Center White Paper Series (FHWA-funded), November 2016.(opens in new tab)
  2. Legal / regulatory Federal Highway Administration, National Bridge Inventory, "Bridge Condition by Highway System 2025" (data as of June 15, 2025).(opens in new tab)
  3. Legal / regulatory 23 U.S.C. § 217(e), "Bridges," Legal Information Institute, Cornell Law School.(opens in new tab)
  4. Legal / regulatory Federal Highway Administration, "General Guidelines for the Geometrics of Bridge Design," from Flexibility in Highway Design (1997, updated 2017).(opens in new tab)

Suggest changes to this page (opens in new tab) Text-only version Last updated October 22, 2026