Multi-Use Trail / Greenway
COL-MUT-06 Multi-Use Trail / Greenway
Typical at: Rural Suburban Compact Urban Core
Undeveloped contexts are an unlikely pairing.
#Modal hierarchy
Modal hierarchy
#Design notes
Distinct from Bike Highway / Greenway (COL-BHG-04), which is bicycle-priority rather than equal-priority, and longer-distance than Shared-Use Path (LOC-SUP-13), with wayfinding and rest amenities mattering more at this length. Appropriate where the trail itself is a recreational or civic destination, not just a through-corridor. Where it runs parallel to a road for a meaningful stretch, see Road-Adjacent Greenway (CDR-RAG-05) for the corridor-scale relationship.1
#Related patterns
- Shared-Use Path (LOC-SUP-13)
- Bike Highway / Greenway (COL-BHG-04)
- Road-Adjacent Greenway (CDR-RAG-05)
#Getting there: Retrofit path options
Barrier-crossing / network reconnection retrofit (RFT-NET-03) commonly takes this form where it crosses a highway, rail line, or disconnected cul-de-sac pattern.
#References
- Legal / regulatory AASHTO, Guide for the Development of Bicycle Facilities, 5th Edition (2024).(opens in new tab)